Demo Portfolio · Synthetic Sample Data
Explore the full demo workspace
Browse existing fleet tools without signing in. This read-only workspace uses bundled fictional examples, never customer records. It does not connect providers, send notifications, run models, upload data, or create work orders.
The 2-site overview, incidents, and report use July 22–August 20, 2026 reference totals. Advanced feature panels are separate illustrative scenarios with their own periods and assumptions—not recalculations of that portfolio, validated accuracy, or promised savings.
Sample portfolio report
July 22–August 20, 2026 · bundled synthetic reference values. Review the portfolio summary and per-site detail below. Authenticated PDF generation, report history, and opt-in weekly/monthly email schedules need your own site data and configured email delivery; this preview creates and sends nothing.
2-site reference portfolio
July 22–August 20, 2026 · synthetic data · unknown additional impact is not zero
- Fictional sites
- 2
- DC capacity
- 3.05 MW
- Synthetic actual energy
- 311.9 MWh
- Modeled expected energy
- 525 MWh
- Reference performance
- 59.4%
- Known modeled shortfall
- 213.2 MWh
- Illustrative known value
- $25,032
- Additional impact
- No unknown flag
Site report detail
| Synthetic site | Status | Performance | Known shortfall | Known value |
|---|---|---|---|---|
| Cedar Ridge Community Solar | Critical | 53.0% | 197.4 MWh | $22,701 |
| Pine Valley School District | Warning | 85.0% | 15.8 MWh | $2,331 |
Unavailable for these read-only samples. Use an actual customer record with the required permissions and configuration.
Ready to use your own data? Your customer workspace preserves your existing session and applies your organization role and plan. Uploads, saved changes, verified routes, schedules, and connections require an authorized account.
Open your customer workspace