Demo Portfolio · Synthetic Sample Data

Explore the full demo workspace

Browse existing fleet tools without signing in. This read-only workspace uses bundled fictional examples, never customer records. It does not connect providers, send notifications, run models, upload data, or create work orders.

The 2-site overview, incidents, and report use July 22–August 20, 2026 reference totals. Advanced feature panels are separate illustrative scenarios with their own periods and assumptions—not recalculations of that portfolio, validated accuracy, or promised savings.

2-site reference portfolio

July 22–August 20, 2026 · synthetic data · unknown additional impact is not zero

Fictional sites
2
DC capacity
3.05 MW
Synthetic actual energy
311.9 MWh
Modeled expected energy
525 MWh
Reference performance
59.4%
Known modeled shortfall
213.2 MWh
Illustrative known value
$25,032
Additional impact
No unknown flag

Independent fleet-feature examples

The panels below reuse the existing availability, PR, archived forecast, SHADOW maintenance, and rule-based recommendation samples. The availability example assumes one 100-kW site. They are not the 2-site portfolio aggregate shown above.

Fleet availability

Availability targets and active events

Capacity-weighted across authorized sites

Technical
98.4%
Contractual
Unavailable
Energy weighted
98.9%
Site median
98.4%
Below target
0
Active outages
1

Availability heatmap

Fleet performance KPIs

Compatible-method portfolio comparison

1 methodology group

Fleet PR · ratio of sums
82.4%
Weighted specific yield
138.8 kWh/kWp
Weighted coverage
96.0%
Below target
0

Fleet energy forecast

Upcoming portfolio production

Server-side deterministic aggregation

Expected energy
5,720 kWh
Expected peak
842 kW
Sites included
1 of 1
Uncertainty
Unavailable

Archived synthetic June 1, 2026 scenario; not a current forecast for the demo portfolio.

Fleet probability is unavailable because common correlated scenarios are absent; site quantiles were not summed.

Predictive maintenance

Fleet maintenance-priority queue

SHADOW

Independent synthetic SHADOW scenario. No model is promoted, no failure date is guaranteed, and no work is dispatched.

Stage 35 · Decision support

Fleet maintenance plan

Ranked actions remain subject to human approval and field safety procedures.

1 active options
  1. Cedar Ridge Community Solar · separate scenario · THERMAL INSPECTIONMODERATE confidence · NEEDS REVIEW
    Priority 76Inspect options

Ready to use your own data? Your customer workspace preserves your existing session and applies your organization role and plan. Uploads, saved changes, verified routes, schedules, and connections require an authorized account.

Open your customer workspace