Demo Portfolio · Synthetic Sample Data
Explore the full demo workspace
Browse existing fleet tools without signing in. This read-only workspace uses bundled fictional examples, never customer records. It does not connect providers, send notifications, run models, upload data, or create work orders.
The 2-site overview, incidents, and report use July 22–August 20, 2026 reference totals. Advanced feature panels are separate illustrative scenarios with their own periods and assumptions—not recalculations of that portfolio, validated accuracy, or promised savings.
2-site reference portfolio
July 22–August 20, 2026 · synthetic data · unknown additional impact is not zero
- Fictional sites
- 2
- DC capacity
- 3.05 MW
- Synthetic actual energy
- 311.9 MWh
- Modeled expected energy
- 525 MWh
- Reference performance
- 59.4%
- Known modeled shortfall
- 213.2 MWh
- Illustrative known value
- $25,032
- Additional impact
- No unknown flag
Independent fleet-feature examples
The panels below reuse the existing availability, PR, archived forecast, SHADOW maintenance, and rule-based recommendation samples. The availability example assumes one 100-kW site. They are not the 2-site portfolio aggregate shown above.
Fleet availability
Availability targets and active events
Capacity-weighted across authorized sites
- Technical
- 98.4%
- Contractual
- Unavailable
- Energy weighted
- 98.9%
- Site median
- 98.4%
- Below target
- 0
- Active outages
- 1
Availability heatmap
- Inspect site availability98.4% technical · 1 open event
Fleet performance KPIs
Compatible-method portfolio comparison
1 methodology group
- Fleet PR · ratio of sums
- 82.4%
- Weighted specific yield
- 138.8 kWh/kWp
- Weighted coverage
- 96.0%
- Below target
- 0
- Inspect site performance KPIs82.4% raw PR · 96.0% coverage · HIGH
Fleet energy forecast
Upcoming portfolio production
Server-side deterministic aggregation
- Expected energy
- 5,720 kWh
- Expected peak
- 842 kW
- Sites included
- 1 of 1
- Uncertainty
- Unavailable
Archived synthetic June 1, 2026 scenario; not a current forecast for the demo portfolio.
Fleet probability is unavailable because common correlated scenarios are absent; site quantiles were not summed.
Predictive maintenance
Fleet maintenance-priority queue
Independent synthetic SHADOW scenario. No model is promoted, no failure date is guaranteed, and no work is dispatched.
- Cedar Ridge Community Solar · separate scenario · INV-03WATCH · STABLE · LOW confidence30-day 0.40%Inspect maintenance evidence
Stage 35 · Decision support
Fleet maintenance plan
Ranked actions remain subject to human approval and field safety procedures.
- Cedar Ridge Community Solar · separate scenario · THERMAL INSPECTIONMODERATE confidence · NEEDS REVIEWPriority 76Inspect options
Ready to use your own data? Your customer workspace preserves your existing session and applies your organization role and plan. Uploads, saved changes, verified routes, schedules, and connections require an authorized account.
Open your customer workspace