Demo Portfolio · Sample Data

Pine Valley School District

Columbus, Ohio · School and municipal rooftops

650 kW DC / 520 kW AC

This fictional site uses synthetic telemetry and modeled estimates. The demo is read-only; conditions are illustrative and have no field-confirmed diagnosis or guaranteed savings.

Site performance diagnostics

Select an analysis to inspect its current condition, evidence, impact, and limitations.

Likely partial inverter outage

Significant underperformance sample

Portfolio reference period: July 22–August 20, 2026 (30 days). These fixed sample totals match the demo portfolio. The Production and Devices tabs show a separate illustrative day.

Synthetic production
89.3 MWh
Modeled expected production
105 MWh
Estimated energy shortfall
15.8 MWh
Estimated value impact
$2,331
Reference performance index
0.850
Reference data completeness
99.1%

A production pattern suggests what to investigate; it does not confirm a physical cause. Qualified personnel would need to review real evidence before deciding on equipment work.