Demo Portfolio · Sample Data
Pine Valley School District
Columbus, Ohio · School and municipal rooftops
650 kW DC / 520 kW AC
This fictional site uses synthetic telemetry and modeled estimates. The demo is read-only; conditions are illustrative and have no field-confirmed diagnosis or guaranteed savings.
Site performance diagnostics
Select an analysis to inspect its current condition, evidence, impact, and limitations.
Likely partial inverter outage
Significant underperformance sample
Portfolio reference period: July 22–August 20, 2026 (30 days). These fixed sample totals match the demo portfolio. The Production and Devices tabs show a separate illustrative day.
- Synthetic production
- 89.3 MWh
- Modeled expected production
- 105 MWh
- Estimated energy shortfall
- 15.8 MWh
- Estimated value impact
- $2,331
- Reference performance index
- 0.850
- Reference data completeness
- 99.1%
A production pattern suggests what to investigate; it does not confirm a physical cause. Qualified personnel would need to review real evidence before deciding on equipment work.