Solar Fault Atlas

Probable causes explained through observable evidence.

ArraySignal uses deterministic rules, physics, time-series analysis, and explicit exclusions. A probable classification is not presented as a confirmed field diagnosis.

01

Outage

Signal
Near-zero actual production during eligible daylight while expected production is material.
Guardrail
Nighttime zeros and periods without trustworthy expected production.
Recommended investigation
Check site availability, protection, meter status, and upstream communications.
02

Persistent underperformance

Signal
Actual production remains materially below weather-adjusted expected production across a sustained eligible period.
Guardrail
Short noise, invalid measurements, established clipping, and communications gaps.
Recommended investigation
Compare inverter-relative performance, irradiance inputs, and recent maintenance history.
03

Clipping

Signal
Production repeatedly plateaus near the configured AC limit during high expected generation.
Guardrail
Clipping is normal system behavior and is not automatically classified as failure.
Recommended investigation
Confirm design DC/AC ratio and determine whether behavior matches the operating model.
04

Possible soiling

Signal
A gradual, persistent daytime performance decline is consistent with accumulation loss.
Guardrail
This remains a probable classification unless inspection or cleaning-response evidence confirms it.
Recommended investigation
Inspect representative modules and compare performance before and after cleaning.
05

Communications/data fault

Signal
Missing intervals, frozen values, duplicate timestamps, invalid measurements, or implausible discontinuities.
Guardrail
Missing telemetry is not converted into production loss without explicit uncertainty.
Recommended investigation
Verify logger connectivity, source exports, clocks, mappings, and sensor health.

Explore your portfolio

Bring a real operating question to the conversation.

We’ll discuss telemetry coverage, portfolio priorities, and a practical evaluation scope—without presenting sample estimates as guaranteed outcomes.

Book a portfolio review